background image

SK5TR

 Attachment Operator’s Manual

Publication number: 054-096; page 4 of 9

Operate Attachment 

  

 

     

1.

Move unit to starting point of trench.

2.

Move track drive controls to neutral.

3.

Move throttle to half open.

4.

Use lift (loader) arm control to lower trencher to 1" (25 mm) 
above ground surface.

5.

Use attachment drive (auxiliary) control to start forward 
digging chain rotation. DIGGING CHAIN WILL MOVE.

6.

Increase engine speed to full throttle.

7.

Use lift (loader) arm control to slowly curl digging boom 
down to digging depth.

8.

Move track drive controls to begin trenching. UNIT WILL 
MOVE.

9.

When trench is complete, move track drive controls to 
neutral.

10. Move throttle to half open.

11. Use lift (loader) arm control to curl boom up to top of 

trench.

12. Use attachment drive (auxiliary) control to stop digging 

chain rotation. 

13. Use lift (loader) arm control to raise trencher. 

14. Use track drive controls to drive unit away from trench.

15. Lower attachment to ground surface. 

16. Idle engine a few moments to stabilize engine temperature.

17. Stop engine.

For Proper Operation

Avoid using badly worn teeth. When replacing teeth, 
maintain original pattern. Use Ditch Witch

®

 

replacement teeth.

Use correct length boom. See your Ditch Witch 
dealer for more information.

Do not make sharp turns. For easier turning, lower 
boom to full depth.

If an object becomes lodged in chain, move digging 
chain control to neutral and raise boom slightly. 
Reverse chain direction. If object must be removed 
manually, turn engine off.

When beginning trench near a wall or fence, allow 
enough distance between boom and footings, drains, 
and cables.

When cutting across asphalt roads, start trench in 
soil at edge of road and dig with shortest possible 
boom at full digging depth.

When straight trenching across a slope, it can be 
helpful to stake a wooden beam parallel to intended 
course and just far enough from trench to guide 
downslope track.

Keep bystanders clear of work area.

Do not walk or work under raised attachments unless 
lift (loader) arms are securely supported.

Avoid sudden starts and stops.

Storage

Store attachment upright in a clean, dry place. Cover 
attachment to keep it clean. 

Moving digging teeth. 

Contact will cause death or serious 
injury. Stay at least 6’ (2m) away. 

To help avoid injury:

 Machine might jerk when digging 

starts. Allow 3’ (1 m) between digging teeth and obstacle.

EMERGENCY SHUTDOWN:

 Turn ignition switch to STOP.

IMPORTANT: 

Trenching movement is toward you.

6ft/2m

Summary of Contents for SK5TR

Page 1: ...er training and read operator s manual before using equipment Contact your local One Call 811 in USA or the One Call referral number 888 258 0808 in USA and Canada to have underground utilities locate...

Page 2: ...hat bottoms of lock pins are visible under attachment plate 1 DANGER decal See Parts Manual for replacement part numbers 2 DANGER stripe decal See Parts Manual for replacement part numbers 3 Lift poin...

Page 3: ...with heavy cloth and loosen connector nut slightly to relieve residual pressure Catch all fluid in a container Before using system check that all connections are tight and all lines are undamaged If...

Page 4: ...ginal pattern Use Ditch Witch replacement teeth Use correct length boom See your Ditch Witch dealer for more information Do not make sharp turns For easier turning lower boom to full depth If an objec...

Page 5: ...cher boom clamp bolts to 78 ft lb 106 N m To adjust chain with sprocket boom 1 Lower boom to ground and stop engine 2 Adjust chain tension by tightening or loosening adjustment screw 2 and jam nut 1 D...

Page 6: ...nd comparing it to new chain Check Digging Chain Teeth and Bits Inspect digging chain teeth for wear as needed Replace worn teeth with new Ditch Witch teeth Each unit is equipped with a standard tooth...

Page 7: ...urn tension bolts counterclockwise to release tension on digging chain 8 Stand clear of chain Do not stand behind boom Keep feet from under boom 9 Remove pin from connector pin and drive pin out of li...

Page 8: ...ts may void warranty consideration Resources Publications Contact your Ditch Witch dealer for publications and videos covering safety operation service and repair of your equipment Ditch Witch Trainin...

Page 9: ...OSE AND MERCHANTABILITY IF THE PRODUCTS ARE PURCHASED FOR COMMERCIAL PURPOSES AS DEFINED BY THE UNIFORM COMMERCIAL CODE THEN THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE FACE HEREOF AND THERE ARE N...

Reviews: