![Ditch Witch FM13V Operator'S Manual Download Page 31](http://html1.mh-extra.com/html/ditch-witch/fm13v/fm13v_operators-manual_2510001031.webp)
Prepare - 30
FM13V/FM13X Operator’s Manual
Gather Information
Gather Information
A successful job begins before the excavation. The first step in planning is reviewing information already
available about the job and jobsite.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Prepare for Working Near Existing Utilities
If jobsite may contain electrical lines, wear protective boots and gloves meeting the following standards:
•
Boots must have high tops and meet the electric hazard protection requirements of ASTM F2413 or
ASTM F1117 when tested at 18,000 volts. Tuck legs of pants completely inside boots.
•
Gloves must have 17,000 AC maximum use voltage, according to ASTM specification D120.
If working around higher voltage, use gloves and boots with appropriately higher ratings.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Summary of Contents for FM13V
Page 1: ...FM13V FM13X Operator s Manual 053 1125 Issue 3 0 ORIGINAL INSTRUCTION...
Page 9: ...Contents 8 FM13V FM13X Operator s Manual...
Page 19: ...Safety 18 FM13V FM13X Operator s Manual Machine Safety Alerts...
Page 37: ...Transport 36 FM13V FM13X Operator s Manual Haul...
Page 55: ...Service 54 FM13V FM13X Operator s Manual As Needed...
Page 59: ...Specifications 58 FM13V FM13X Operator s Manual...
Page 62: ......
Page 63: ......
Page 64: ...FM13V FM13X Operator s Manual Service Record 63 Service Record Service Performed Date Hours...
Page 65: ...Service Record 64 FM13V FM13X Operator s Manual Service Performed Date Hours...