ATTENTION:
Unpack the unit and confirm all hardware are present. If any hardware required is missing, or if you have any
ques�ons regarding our products, please contact D2G customer service.
Assemble the unit on a carpeted floor or on a so� surface work area to avoid any scratch.
A phillips screw driver is needed. 2 people recommended.
1. Insert 2 cam posts (H2) into holes in Panel C. Tighten only un�l
snug. Fit cam holes in the edge of Panel F over the cam posts. Insert
2 cam locks (H1) into cam lock holes on Panel F, use a phillips screw
driver to turn cam locks clockwise to secure cam posts. DO NOT
over-�ghten.
2. Insert 2 cam posts into holes in Panel D as shown below. A�ach
assembled Panel C to Panel D by inser�ng cam posts into the cam
lock holes. Insert 2 cam locks into cam lock holes on Panel C, turn
cam locks clockwise with a phillips screw driver to secure cam posts.
3. Insert 9 cam posts into holes in Panel B as shown below. A�ach
the assembled panels in STEP 2 to Panel B and use cam locks to
securely lock it in place.
4. Assemble Panel H by fi�ng cam lock holes in Panel H with 2 cam
posts. Lock Panel H securely by inser�ng cam locks and rota�ng
clockwise.
H1
Cam Lock
H2
Cam Post
PARTS
A Top Panel
B Side Panel
C Bo�om Panel
D Back Panel
F Toe Kick Panel
G Swing Door
g “THANK YOU” Flip Door
H Divider Panel
1pc
2pcs
1pc
1pc
1pc
1pc
1pc
1pc
HARDWARE
H1 Cam Lock
H2 Cam Post
H3 Wood Screw
H4 Concealed Hinge
H5 Tray Rail
H6 Screw
30pcs
30pcs
12pcs
2pcs
3pcs
6pcs
ASSEMBLY INSTRUCTIONS
TRASH RECEPTACLE - TOP RAIL
1 of 2
Ver. 03/18