background image

7

Assembly / Operating Instructions

Assembling plastic components

1.  Place the three storage containers into 

position on the upper rails of the side 
frames, creating a shelf in the centre 
of the unit.

2.  Place the left component of the side 

tray into position, then place the right 
component ensuring it clips into the 
left component as shown. Ensure the 
side tray rests against the bar on the 
top frame.

3.  Place bathtub into position as shown

Change pad operation

1.  To lower change pad, lift using 

handle tab on the front, and push 
backwards behind change centre.

2.  To raise change pad, lift using 

handle tab on the front, and pull 
upwards into position.

3.  Always ensure, that when using change pad the two safety 

straps are secured to the press studs on each end panel.

1.

1.

2.

2.

3.

3.

Summary of Contents for NEMO Palma Change Centre 057630-259

Page 1: ...NEMO Palma Change Centre Introduce your little character to ours Model 057630 259 ...

Page 2: ... accessories and manufacturer approved parts only Always ensure that the change pad locking tabs are locked in place when the change pad is raised and not in use Do not use this change pad if any part is torn broken or missing Ensure that the change centre is completely assembled and check that all parts are securely tightened before use Regularly check all parts for tightness tighten or replace i...

Page 3: ...ifications without notice as a result of our ongoing policy of product improvement Contents Assembly contents list Assembly Operating instructions How to care for your Change Centre Congratulations on your purchase of the Nemo Palma Change Centre This product has been designed and developed with safety comfort and functionality in mind Please take the time to read this manual carefully before usin...

Page 4: ...ssing please contact Customer Service In Australia contact CNP Brands on 1300 667 137 in New Zealand contact Wainhouse Distribution on 0800 567 5000 x2 x2 x1 x1 x1 x3 x1 x1 x1 x1 x4 x12 x1 x1 End panel Side frame Change Pad Bottom shelf Bathtub Storage containers Side tray with towel rail L R Nappy bag Top frame Drainage hose Castors Bolts Bath plug Plastic assembly tool ...

Page 5: ... panel and secure with bolts using plastic assembly tool Do not tighten bolts completely 4 Repeat to attach second end panel Attaching castors Slide castors onto end panels with castors pointing down Assembling top frame 1 Place top frame into position and attach to one end panel with two bolts using plastic assembly tool Do not tighten bolts completely 1 2 3 4 Assembly Operating Instructions ...

Page 6: ...ining hole in end panel 3 Tighten all twelve bolts To attach bottom shelf 1 Place bottom shelf in position as shown 2 Fold up sides and attach end flaps around vertical bars of side panels using press studs to secure as shown 3 Attach flaps underneath around bottom rail of side bar using velcro as shown To attach change pad Place change pad into position and attach to thin rail of top frame using ...

Page 7: ...nt ensuring it clips into the left component as shown Ensure the side tray rests against the bar on the top frame 3 Place bathtub into position as shown Change pad operation 1 To lower change pad lift using handle tab on the front and push backwards behind change centre 2 To raise change pad lift using handle tab on the front and pull upwards into position 3 Always ensure that when using change pa...

Page 8: ...change centre wipe down with a damp cloth and use a mild soap solution if necessary Do not use abrasive cleaners Always store product in a clean dry place Maintenance Always check parts regularly for tightness of bolts nuts and other fasteners tighten or replace if required To maintain the safety of your change centre seek prompt repairs for bent torn worn or broken parts Use only those parts and ...

Reviews: