8
Assembly
4. Attach Hopper
.
1. Position hopper on shredder inlet flange (see Figure 4).
2. Attach with four M10 x 20 Bolts and M10 Nylock nuts.
5. Install Shredder Safety Guard
1. Position the shredder guard inside the hopper (see
Figure 5).
2. Attach using two M10 x 30 Bolts and M10 Nylock
nuts.
6. Install Debris Collection Bag
1. Unfold bag support arm and lock into straight position
as shown (see Figure 6).
2. Feed end of bag support arm into hole of the bag arm
bracket and rest in u-shaped slot.
3. Slide bag onto support arm, drawing the bag inlet over
the discharge flange and tighten the draw string.
M10 X 20 BOLT,
4 Plcs
M10 NYLOCK
NUT, 4 Plcs
HOPPER
Figure 4
Figure 5
M10 NYLOCK
NUT, 2 Plcs
Figure 6
SHREDDER
SAFETY
GUARD
SHREDDER
INLET FLANGE
M10 X 30
BOLT, 2 Plcs
HOPPER
BAG SUPPORT
ARM
DEBRIS COLLECTION
BAG
BAG ARM
BRACKET
SPRING
PLUNGER
U-SHAPED
SLOT
DEFLECTOR
DISCHARGE
FLANGE