
Instructions d’installation/ Installation instructions : F6313T949
Ensemble Adaptateur F63 / Adapter Kit F63: NewHolland FX K27516
20 mars 2014
Installation instructions
Step 1: Reception
Refer to the operator’s manual for reception and instructions to remove the transport
skid. It is important to remove the temporary lift arm form the header before operating
it.
Step 2: Preparation
Remove the binder support on the left side (1) and disassemble the compression spring
(2).
Step 3 : Drive module installation
Using a winch or a lift, approach the drive module to the rear left side. Set in place with 8
flange nuts and ½’’ x 1-1/4’’ (3) bolts, and four ½’’ x 1’’ (4). Loosen the joint bolts (5) as if
necessary to align the elements. Support the module while tightening the bolts to maintain
squareness with the frame.