Note: A separate switch is used to control each of the four LED arrays within one or more
Powerhouse
units. Diagram
shows 2 units wired together so that both can operate at 25%, 50%, 75% or 100% light level dependent upon switching.
• After the connections have been secured, the floodlight front (Connection Box front) should be fastened to the
Connection Box using the 4 Connection Box Screws.
• Once screws are secure, the screw covers should be fitted [Fig.10]
• To secure the angle of light of the
Powerhouse
set the desired position, tighten the 2 Securing bolts then use the 2 x
Allen screws and washers to lock the position of the
Powerhouse
on the U bracket [Fig.11].
5. AFTER CONNECTING POWER SUPPLY
9:
2
NEUTR
NEUTR
Fig. 10
Fig. 11