3. operation
I prepare before switching on.
1. prepare tool
:
i.
5-inch,6-inch all within a hexagonal wrench.
ii.
Cross screw 4
iii.
14-17
、
17-19of a double-headed wrench
iv.
a blender or a stirring rod
v.
antivirus mask and a set of overalls
vi.
a brush
vii.
some rags
viii.
a multimeter
ix.
30-meter
,
2.5MM
²
power line extension
x.
a power regulator
2. preparetory steps
:
⑴
assurance suction tube and the reflux tube link the right of position and screwed tightly
⑵
firstly contect on the coating manometer exit ,then 15 meter high presure nylon coating
of pressure gauges connected to the export terminal and screwed tightly (pressure gauge
in the first coating to the exit)
⑶
havig to use two wrench will be no high-pressure airless spray gun connected to the
head and another screwed tightly .
⑷
detemine pressure manometer control buttons set in the display more than 150
locations
(5)multimeter detemined by measureing power supply is 220-250(equipment allowing
fluctutation of voltage )volts of voltage.
(6)equipment will be displayed at the distance of at least 7.5meters in construction place
dry region .