U
N P A C K I N G A N D
S
E T U P
This chapter provides unpacking and setup information for the
Switch.
Unpacking
Open the shipping carton of the Switch and carefully unpack its
contents. The carton should contain the following items:
One 5-Port 1000BASE-T Gigabit Ethernet Switch
Four rubber feet with adhesive backing
One external power adapter
This User’s Guide
If any item is found missing or damaged, please contact your
local reseller for replacement.
Setup
The setup of the Switch can be performed using the following
steps:
Install the Switch in a fairly cool and dry place. See
Technical Specification
for the acceptable operation
temerature and humidity ranges.
Install the Switch in a site free from strong
electromagnetic source,vibration, dust,and direct sunlight.
Leave at least 10cm of space at the left and right hand
side of the Switch for ventilation.
Visually inspect the DC power jack and make sure that it
is fully secured to the power adapter.
6
Summary of Contents for DN-8007C1
Page 1: ...User s Guide DN 8007C1 ...