U
NPACKING AND
S
ETUP
This chapter provides unpacking and setup information for
the Switch.
Unpacking
Open the shipping carton of the Switch and carefully
unpack its contents. The carton should contain the
following items:
One 8-Port 1000BASE-T Gigabit Ethernet Switch
Four rubber feet with adhesive backing
One external power adapter
This User’s Guide
If any item is found missing or damaged, please contact
your local reseller for replacement.
Setup
The setup of the Switch can be performed using the
following steps:
Install the Switch in a fairly cool and dry place. See
Technical Specification
for the acceptable operation
temerature and humidity ranges.
Install the Switch in a site free from strong
electromagnetic source,vibration, dust,and direct
sunlight.
Leave at least 10cm of space at the left and right hand
side of the Switch for ventilation.
Visually inspect the DC power jack and make sure
that it is fully secured to the power adapter.
6
Summary of Contents for DN-8006C1
Page 1: ...User s Guide DN 8006C1 ...