background image

 

2.

 

Installing and Connecting the Switch 

This part describes how to install your Ethernet Switch and make 

connections to it. Please read the following topics and perform 

the procedures in the order being presented. 

 

2.1 Installation 

Please follow the following instructions in avoid of incorrect 

installation causing device damage and security threat.   

 

 

Put the Switch on stable place or desktop in case of   

falling damage. 

 

Make sure the Switch works in the proper DC input range   

and matches the voltage labeled on the Switch. 

 

To keep the Switch free from lightning, do not open the 

Switch's shell even in power failure. 

 

Make sure that there is proper heat dissipation from and 

adequate ventilation around the Switch. 

 

Make sure the cabinet to enough back up the weight of   

the Switch and its accessories. 

 

2.2 Desktop Installation 

Sometimes users are not equipped with the 19-inch standard 

cabinet. So when installing the Switch on a desktop, please attach 

these cushioning rubber feet provided on the bottom at each 

corner of the Switch in case of the external vibration. Allow 

adequate space for ventilation between the device and the 

objects around it. 

 

 

 

Summary of Contents for DN-80069

Page 1: ...8 Port 10 100Mbps Ethernet Unmanaged Switch Quick Installation Guide DN 80069 ...

Page 2: ... website Our company endeavors to ensure content accuracy and will not shoulder any responsibility for losses and damages caused due to content omissions inaccuracies or errors 1 Product Introduction The 8 Port 10 100 Mbps Network switch from DIGITUS provides 5 x RJ45 ports with 10 100Mbps bandwidth each Easily expand the existing network No configuration is required on the switch itself thanks to...

Page 3: ...o MDI MDI X No configuration necessary LED indicators for monitoring power link activity 1 2 Package Contents Before installing the Switch make sure that the following the packing list listed OK If any part is lost and damaged please contact your local agent immediately In addition make sure that you have the tools install switches and cables by your hands 1 x 8 Port Fast Ethernet Network Switch 1...

Page 4: ...Table 1K Indicators Per Device Power Green Per Port 10 100Mbps Link Act Green Switching Capacity 1 6Gbps Packet Buffer 448Mbit Packet Forwarding Rate 745Kpps Jumbo Frame 1552Bytes Power Supply DC 5V 550mA External power adapter supply Power Consumption Maximum 1 40W 5V DC Dimensions W x D x H 140 67 26mm Environment Operating Temperature 0 C 40 C Storage Temperature 40 C 70 C Operating Humidity 10...

Page 5: ...ntial problem with the Switch connection or attached devices The following chart shows the LED indicators of the Switch along with explanation of each indicator LED Indicator Faceplate Marker Status Indication Power Indicator Power Off Power Off Solid green Power On 10 100 BASE T adaptive Ethernet port indicators 1 8 Link Act Off Power Off Solid green Power On Blinking The port is transmitting or ...

Page 6: ...a corresponding Link Act indicator Rear Panel The rear panel of the Switch consists of one Grounding Terminal and a 5V DC power adapter interface Grounding Terminal Located on the left side of the rear panel use wire grounding to lightning protection DC Power Connector Located on the right side of the rear panel power supply via external power adapter using 5V 550mA external power supply ...

Page 7: ...ange and matches the voltage labeled on the Switch To keep the Switch free from lightning do not open the Switch s shell even in power failure Make sure that there is proper heat dissipation from and adequate ventilation around the Switch Make sure the cabinet to enough back up the weight of the Switch and its accessories 2 2 Desktop Installation Sometimes users are not equipped with the 19 inch s...

Page 8: ...e Please make sure that the front panel is exposed in order to view the LEDs Please refer to the illustration below Step one Please drill two suitable holes press two expansion tubes into the two holes respectively Step two Insert the screw into the expansion tube Step three Hang the switch on the two screws Step four Installation is completed ...

Page 9: ...work card driver please connect one end of the twisted pair to RJ 45 jack of your computer the other end will be connected to any RJ 45 port of the Switch the distance between Switch and computer is around 100 meters Once the connection is OK and the devices are power on normally the LINK ACT status indicator lights corresponding ports of the Switch Hereby Assmann Electronic GmbH declares that the...

Reviews: