Step 9: Checking the Power-Up Test Results
The power-up test can take several minutes to complete, depending on the
number of installed options and on which default settings you use.
1. If the power-up test results displayed on the screen are similar to the
results in Example 1–1, the system has passed the power-up test. Go to
step 9.
2. If the power-up test results displayed on the screen are not similar to the
results in Example 1–1, the system has not passed the power-up test. See
Example 1–2 for a typical failure.
Example 1–1 Successful Power-Up Test Screen
KA53-A VX.X, VMB 2.14
Performing normal system tests.
72..71..70..69..68..67..66..65..64..63..62..61..60..59..58..57..
56..55..54..53..52..51..50..49..48..47..46..45..44..43..42..41..
40..39..38..37..36..35..34..33..32..31..30..29..28..27..26..25..
24..23..22..21..20..19..18..17..16..15..14..13..12..11..10..09..
08..07..06..05..04..03..
Tests completed.
>>>
Central Processing Unit (CPU) Name, Firmware Version Number, and
Virtual Memory Boot (VMB) Version Number
Read-Only Memory (ROM) based diagnostics countdown
Status Message
Console Prompt
Installation Procedure 1–9