1.
Installed on the desktop
Place the machine on a clean bench, this installation is relatively simple,
you can observe the following operation:
●
Ensure the smooth workbench.
●
Around the device enough space for heat dissipation.
●
Do not place objects on the device.
2.
Mounted on the wall
●
Observation ONU equipment chassis two cruciform recess, in
accordance with the position of the groove, installed two screws in the
wall.
●
The original selected two mounting screws gently snap into recesses
aligned.
●
Slowly let go, so that the device under the support of the screw
hanging on the wall.
2:2 Panel Lights
LED
Mark
Status
Description
Registration
REG
On and
Green in
colour
The device is registered to the PON system
Off / Red
in colour
Device is not registered to the PON system
Blink
Device registration is incorrect
Fast Blink Port is sending or/and receiving data
Interface
LINK/
ACT
On
Port is connected properly (LINK)
Off
Port connection exception or not connected
Blink
Port is sending or/and receiving data (ACT)
System
SYS
On / Off
System is not running or fatal error
Blink
Normal running
Summary of Contents for DG-GR1010
Page 1: ...V2 0 05 01 2021 GEPON ONU Router with 1 PON and 1 Giga Port DG GR1010...
Page 14: ......
Page 15: ......