9
FIG. n°4 - Technical – serial number plate
4.3 – WIRING DIAGRAM
4.3.1 – single-phase wiring diagram
4.4 - CONTROLLING OPERATION
Check cutter operation with the following procedure:
1. Check that the cutters holder is inserted correctly into the seat
2. Close the lid, turning it anti-clockwise and controlling that the two closing attachments on
CHAP. 4 - INSTALLATION
4.1 – POSITIONING THE MACHINE
The surface on which the machine is situated must consider the dimension of support indicated
in
Tab.1
(on the basis of the model), and therefore be large enough; it must be level, dry,
smooth, strong and stable and have a height from the ground of about 80 cm.
Moreover, the machine must be positioned in a non-saline environment with max. humidity of
75% and at a temperature b5°C and +35°C; therefore in environments that do not lead
to malfunctioning of the same.
4.2 – ELECTRIC CONNECTION
The machine is supplied with a power supply cable with section of 3x1mm²; length 1.5 m and a
“SHUKO” plug.
Connect the 230 Volt 50 Hz machine and position a 10A,
I = 0.03A circuit breaker switch.
At this point, check that the earth plant functions perfectly.
Also check that the data given on the technical-serial number
plate (
FIG. n°4)
corresponds to the data given on the ship-
ping and transport documents.
FIG. n°5 - Wiring diagram
8
CHAP. 3 – RECEIPT OF THE MACHINE
3.1 – SHIPPING THE MACHINE
(
see FIG. n°3
)
The cutter leaves our warehouses carefully packaged. The packaging is made up from:
a) strong external cardboard box
b) the machine
c) the manual
d) vane
e) stainless steel cutters holder
f) cutters holder in ABS
g)
CE
certificate of conformity.
FIG. n°3 - Description of the packaging
a)
d)
e)
c)
b)
f)
3.2 – CHECKING THE PACKAGING ON RECEIPT
On receipt of the package, if external damage is not detected, open the same and control that all
material is present (
see FIG. n°3
). If, however, on receipt, there are signs of bad handling,
blows or falls, the carrier must be informed of the damage and an accurate report regarding any
damage to the machine must be drawn-up within three days from the date indicated on the
documents.
Do not turn the package upside down!!
On transport, make sure it is fastened in
the 4 fundamental points (keeping it parallel to the floor).
3.3 – DISPOSING OF THE PACKAGING
The packaging components (cardboard, any pallets, plastic strapping and polyurethane foam)
are products similar to urban waste; for this reason they can be disposed of easily.
If the machine is installed in countries with particular Standards, dispose of the packaging in
compliance with that prescribed by the Standards in force.
g)