UNPACKING AND INSPECTION 

The VLI consists of the following items: 

 

Table 1.  

VLI Parts List

 

DESCRIPTION 

PART # 

1 ea. 

Visible Level Interface (VLI) 

100693 

6 ea. 

DH 1500 Gland (1500 bar, metric thread) 

100265 

4 ea. 

DH 1500 Collar (1500 bar) 

100278 

2 ea. 

DH 1500 Plug (1500 bar) 

102053 

1 ea 

O-Ring (spare) 

101063 

4 ea 

4x12 mm Button Head Screw 

NPN 

1 ea. 

Operation and Maintenance Manual 

550039 

OPTIONAL 

PART # 

1 ea. 

 

1 ea. 

VLI Stand, High 
OR 
VLI Stand, Low 

100703 

 

100702 

 

2.2

 

INITIAL SETUP 

  Place the VLI on the same surface as the piston gauge or other reference to which it is to be connected. 

  Ensure the VLI and the connecting hardware are clean and free of contamination. 

  Connect the VLI to the standard using the connecting hardware supplied. 

 

If the piston gauge medium has the greater density, the connection should be made at the lower port 
of the VLI.  If this is not true, then the connection should be made at the middle port. 

  Fill the VLI through the connecting hardware to the tip of the interface level indicator with the fluid that 

has the highest density. 

  Remove the upper pet-cock on the VLI.  Carefully fill the rest of the VLI with the lighter medium until 

the air is completely displaced form the VLI.  Install the upper pet-cock and tighten hand tight. 

  When interfacing a gas medium with a liquid medium the control of pressure must be performed on 

the gas side.  A variable volume in the hydraulic side is necessary to adjust the change in the 
interface level as pressures and temperatures change. 

Summary of Contents for VLI

Page 1: ...1998 2007 DH Instruments a Fluke Company VLI Visible Level Interface Operation Maintenance Manual...

Page 2: ...plied is provided DH Instruments disclaims any responsibility or liability for any direct or indirect damages resulting from the use of the information in this manual or products described in it Menti...

Page 3: ...TS S TABLE OF CONTENTS I 1 INTRODUCTION 1 1 1 PRODUCT OVERVIEW 1 1 2 OPERATING PRINCIPLE 1 1 3 COMPONENT LOCATION 1 2 INSTALLATION 3 2 1 UNPACKING AND INSPECTION 3 2 2 INITIAL SETUP 3 2 3 OPERATION 4...

Page 4: ...VLI OPERATION MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page II N NO OT TE ES S...

Page 5: ...same as the medium used by the test Max working pressure of VLI P N 100693 is 100 MPa 15 000 psi 1 2 OPERATING PRINCIPLE This component interfaces two pressure media in a high pressure chamber Using...

Page 6: ...VLI OPERATION MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page 2 N NO OT TE ES S...

Page 7: ...the connecting hardware are clean and free of contamination Connect the VLI to the standard using the connecting hardware supplied If the piston gauge medium has the greater density the connection sho...

Page 8: ...volume can be adjusted to fine tune the interface reference level Again unless the fluid temperature or the volumes change the level will stay the same Decreasing pressure is achieved by releasing ga...

Page 9: ...NCE Page 5 1998 2007 DH Instruments a Fluke Company 3 3 M MA AI IN NT TE EN NA AN NC CE E No special maintenance requirements are necessary for the VLI Attention to cleanliness in the system is the on...

Page 10: ...VLI OPERATION MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page 6 N NO OT TE ES S...

Page 11: ...ANNEX Page 7 1998 2007 DH Instruments a Fluke Company A AN NN NE EX X...

Page 12: ...VLI OPERATION MAINTENANCE MANUAL 1998 2007 DH Instruments a Fluke Company Page 8...

Reviews: