background image

MATERIALS: 

Warped Wall

  

3 - Main Sections (Only 2 Sections for 10’ Warped Wall) 

8 – 3” deck screws for joining sections inside of Warped Wall 

2 – Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block pre-
installed.) 

2” Deck Screws for securing Rock Wall Panels  

4 - wedge 

bolts

 

Monkey Bars

 

2 – 13ft. Side Rails, 13 – 4ft. Rungs

, 1 - Wooden Lift Support

2

6

 – 3/16” Allen head bolts 

Four ½” x 4” Bolts with Flat and Lock Washers (Monkey Bar to Warped Wall) 

Eight 3/8”x 

2

 ¼” Bolts with Flat and Lock Washers (Monkey Bar to Salmon Ladder) 

Salmon Ladder

 

1 – Header Board 

2 – Uprights

, 4 - Wedge 

Bolts

26 - Pegs 

4 – 3/8” x 4” Carriage Bolts with Flat and Lock Washers 

1 – Bar 

2 – Pulley Rigs for Top of uprights with 20 - 1 ½” drywall screws for mounting to top of uprights  

2 – Weights with rope 

2 – Post Pads 

with 16 - 2" Deck Screws

Pegboard 

1 – Pegboard 

with 4 - 12" Pegs

1 – Pegboard Spacer Block (Pegboard to Warped Wall) 

3 – ½” x 10” bolts with flat and lock washers (Pegboard to Warped Wall) 

1 – Pegboard Mounting Plate (For Pegboard to Salmon Ladder) 

3 -  1/2" x 3 1/2" Carriage Bolts with flat washers, lock washer & nuts (Pegboard to Mounting Plate)

3 – 3/8” x 6” bolts with 2 flat washers 

&

 locking nut (For Pegboard Mounting Plate to Salmon

 

Ladder)

Real Life Ninja Starter Pack

 1

Assembly Instructions

DGS - 17 Lucienne Ave. Danielson, CT 06239 - 800-932-3339 - [email protected] 

Please visit gymsupply.com for product assembly videos.

Summary of Contents for Real Life Ninja Starter Pack 1

Page 1: ...26 Pegs 4 3 8 x 4 Carriage Bolts with Flat and Lock Washers 1 Bar 2 Pulley Rigs for Top of uprights with 20 1 drywall screws for mounting to top of uprights 2 Weights with rope 2 Post Pads with 16 2...

Page 2: ...r Socket 9 16 Socket Adjustable Wrench Phillips Head Screw Driver Drill with Hammer setting 3 8 Wedge Bit Impact Driver Hammer 3 16 Allen Key DGS 17 Lucienne Ave Danielson CT 06239 800 932 3339 info g...

Page 3: ...DGS 17 Lucienne Ave Danielson CT 06239 800 932 3339 info gymsupply com Please visit gymsupply com for product assembly videos...

Page 4: ...e front surface of the wall is flush Any overhang should be on the higher section so someone sliding down the face would not catch on it Middle Bottom Middle Bottom Middle Bottom Reinstall previously...

Page 5: ...dust and debris from the hole Step 3 Select a powered impact wrench that does not exceed 245 ft lbs maximum torque Tscrew for the selected anchor diameter Attach an appropriate sized hex socket drive...

Page 6: ...els to back of warped wall using 2 Deck Screws into pre drilled holes Be sure the panel with pre installed mounting block is installed with the block closest to the top and that top edge of panel is f...

Page 7: ...t Pegboard into place and secure on Salmon Ladder end Secure on warped wall end using supplied bolts through spacer block into pre installed inserts in side of warped wall 16 17 Check to make sure mon...

Page 8: ...and rope to slide behind Unwrap rope and pull taught Measure to the center of the rope and cut in the middle leaving one length of rope extending from each side of the bar Thread cut end of rope over...

Reviews: