
11
www.dextranet.com
•
Space for equipment installation and environmental
element (ventilation, drainage and power etc.)
It is required to understand the subscriber extension plan, ventilation and
drainage for the installation site. This is to ensure successful equipment
installation and endure the rainy season or hot temperatures. Be mindful
that dust may damage system components if they are installed in such
places.
•
If there is any spare line
If there is any spare lines, it is strongly recommended to use spare lines for
subscriber connection. It can reduce the time and efforts to install the
system because it doesn
’
t require