background image

H
H

NQCC (Non Quick Change Chuck)

Summary of Contents for D25123K

Page 1: ...H H D25032 to D25263K Combination Hammers ...

Page 2: ...ffering 22mm 2 mode D25123K D25223K D25012K D25013K D25124K 22mm 3 mode 26mm 3 mode 26mm 3 mode QCC 26mm 3 mode 22mm 2 mode D25133K D25263K D25032K D25033K D25134K 22mm 3 mode 26mm 3 mode 26mm 3 mode QCC 28mm 3 mode D25144K 28mm 3 mode QCC GAP ...

Page 3: ...H H OPP Short Stack Motor MPP Medium Stack Motor HPP Long Stack Motor Modular Conception ...

Page 4: ...H H 22 mm OPP Hammer Durable 710 Watt short stack motor 20 mm Ram 15 5 mm stroke wobble bearing Jam pot housing ...

Page 5: ...H H 26 mm MPP Hammer durable 800 Watt medium stack motor 20 mm ram 18 9 mm strocke wobble bearing jam pot housing ...

Page 6: ...H H 28 mm HPP Hammer durable 900 Watt long stack motor 22 mm ram 22 0 mm strocke wobble bearing jam pot housing non pumping beat pice ...

Page 7: ...H H New Range Visual Differentiation 26mm 22mm 28mm Plastic rear handle Rubber grip rear handle Rubber grip side handle Rubber grip rear handle Rubber grip side handle Silver panel Side handle light ...

Page 8: ...H H Before repair and service Follow the safety instructions ...

Page 9: ... accessories drill bits chisels cutters etc Never repair a product whilst it is plugged into a power supply or a battery is connected Remove accessories drill bits chisels cutters etc Release tension on parts before attempting to remove for example arm springs Where fitted ensure side handles function correctly After repair Carry out Earth continuity Earth leakage and Insulation test flash test wh...

Page 10: ...HORARIO DRAAI LINKSOM TURN CLOCKWISE DREHEN IN UHRZEIGERSINN GIRARE IN SENSO ORARIO TOURNEZ DANS LE SENS DES AIGUILLES D UNE MONTRE GIRO DERECHA GIRAR NO SENTIDO HORARIO DRAAI RECHTSOM MOVE IN THIS DIRECTION IN RICHTUNG BEWEGEN MUOVI IN DIREZIONE BOUGEZ DANS CETTE DIRECTION DIRECION DE LA FLECHA AVANÇAR NESSA DIREÇAO BEWEEG IN DE RICHTING VAN DE PIJL CORRECT RICHTIG CORRETTO CORRECT CORRECTO CORRE...

Page 11: ...DE FUNCIONAMENTO FUNCTIETEST CLEAN THE TOOL GERÄT REINIGEN PULIRE L UTENSILE NETTOYEZ L OUTIL LIMPIEZA DE HERRAMIENTAS LIMPE A FERRAMENTA REINIG HET TOESTEL SEND THE TOOL TO THE CUSTOMER GERÄT ZUM KUNDEN SENDEN SPEDIRE L UTENSILE AL CLIENTE EXPEDIEZ L OUTIL AU CLIENT ENVIAR LA HERRAMIENTA AL CLIENTE ENVIAR A FERRAMENTA AO CLIENTE VERZEND HET TOESTEL NAAR DE KLANT ...

Page 12: ...H H High voltage Test has to be carried out High Voltage Test ...

Page 13: ... sure the unit is in a electrical good condition like Power cable must be in good condition in order to avoid electrical injuries High voltage test must be carried out in order to be sure the whole unit is in a electrical safe condition ...

Page 14: ...H VOLTAGE TEST MUST BE DONE VDE 0701 BVG A2 PROTECTION CLASS 2 double isolation 3sec 2500V PROTECTION CLASS 1 earth wire 3sec 1000V Earth wire examination up to 5 m 0 3 Ohm per further 5m 0 1Ohm Before repair ...

Page 15: ...H H Before repair and service Check all functions of the unit Tool Holder Mode Selector Switch power cable is not plugged in Switch lock Front handle Hammer mechanism Spindle lock system ...

Page 16: ...H H Before repair Function Test ...

Page 17: ...ysis is a step by step approach that leads to the identification of a fault s first or root cause Every system equipment or component failure happens for a reason There are specific succession of events that lead to a failure A root cause analysis investigation follows the cause and effect path from the final failure back to the root cause ...

Page 18: ...H H Durability of pneumatic hammers heavily depends upon CLEANLIESS during service ...

Page 19: ...H H 2015 33 59 ...

Page 20: ...H H ...

Page 21: ...H H 1 2 3 4 ...

Page 22: ...H H 3x16 Ph1 ...

Page 23: ...H H ...

Page 24: ...H H 4x18 Tx20 4x39 4 Tx20 4x45 Tx20 ...

Page 25: ...H H ...

Page 26: ...H H 4x18 Tx20 ...

Page 27: ...H H ...

Page 28: ...H H ...

Page 29: ...H H Allen Key 1 5 ...

Page 30: ...H H HPP D25263 2015 33 59 ...

Page 31: ...H H 4x18 Tx20 4x42 Tx20 ...

Page 32: ...H H ...

Page 33: ...H H 1 5mm ...

Page 34: ...H H ...

Page 35: ...H H 4x18 Tx20 ...

Page 36: ...H H 4x45 Tx20 4x42 Tx20 4x18 Tx20 ...

Page 37: ...H H ...

Page 38: ...H H ...

Page 39: ...H H ...

Page 40: ...H H ...

Page 41: ...H H 3 8 Tx20 ...

Page 42: ...H H ...

Page 43: ...H H ...

Page 44: ...H H ...

Page 45: ...H H ...

Page 46: ...H H ...

Page 47: ...H H 4x39 65 Tx20 ...

Page 48: ...H H 1 2 3 4 ...

Page 49: ...H H ...

Page 50: ...H H ...

Page 51: ...H H QCC Quick Change Chuck ...

Page 52: ...H H ...

Page 53: ...H H ...

Page 54: ...H H ...

Page 55: ...H H ...

Page 56: ...H H ...

Page 57: ...H H ...

Page 58: ...H H ...

Page 59: ...H H 1 2 3 4 ...

Page 60: ...H H ...

Page 61: ...H H ...

Page 62: ...H H ...

Page 63: ...H H ...

Page 64: ...H H 4x19 4 Tx20 ...

Page 65: ...H H ...

Page 66: ...H H ...

Page 67: ...H H 1 2 3 4 ...

Page 68: ...H H 4x9 2 Tx20 ...

Page 69: ...H H ...

Page 70: ...H H ...

Page 71: ...H H 1 2 3 4 ...

Page 72: ...H H ...

Page 73: ...H H ...

Page 74: ...H H ...

Page 75: ...H H ...

Page 76: ...H H NQCC Non Quick Change Chuck ...

Page 77: ...H H 1 2 3 4 ...

Page 78: ...H H ...

Page 79: ...H H ...

Page 80: ...H H Remember the next check will be made by your customer ...

Reviews: