
17
11)
At this point, you can remove the basin and drill the holes
marked on the wall.
Fit the basin support brackets and fasten them with screws and
rawlplugs not supplied.
9)
Rest the basin (G) on the
supports fitted on the structure,
holding it at the rear.
10)
Keeping the basin in the correct
position with the aid of the level,
mark the position of the holes for
fastening the basin support S-shaped
brackets.
F
ENG
Summary of Contents for New Etoile
Page 1: ......
Page 43: ...A x1 B x2 C x2 D x2 E x2 F x8 44 A B F C D E x8...
Page 44: ...45 E New Etoile x1 F S 2 Devon Devon G H P Y C...
Page 45: ...46 2 1...
Page 46: ...47 3 4 D 5 P Y C...
Page 47: ...48 6 7 8 8...
Page 48: ...49 11 9 10 S F P Y C...
Page 49: ...50 14 12 13...