Tube Installation Sequence
20 Foot
50 Foot
60 Foot
70 Foot
30 Foot
40 Foot
Stainless Steel Clamp on 175 - 200 MBH models (P/N: TP-220).
Figure 2.4
•
Tube Installation Sequence
Stainless Steel Clamp on 175 MBH models (P/N: TP-220).
Stainless Steel Clamp Location (P/N: TP-220).
Important!
The combustion chamber & radiant tube sections must be installed in the following order.
80 Foot
Stainless Steel Clamp on 175 - 200 MBH models (P/N: TP-220).
Stainless Steel Clamp Location (P/N: TP-220).
Key
Burner Control Box with
16” Burner Tube
Black Coated Combustion
Chamber Tube*
Black Coated Aluminized Combustion
Chamber/Radiant Emitter Tube
Standard Tube Clamp
Stainless Steel Tube
Clamp (P/N: TP-220)
175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.
*
Aluminized steel (50,000 to 125,000 BTU/h models), Titanium stabilized aluminized steel (150,000 to 200,000
models).
NOTE:
Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.
Baffle Location
11
DX2
Series
2.0
Installation
•
Tube Sequence
•
Heater Length