
DESMI Pumping Technology A/S
7
Tagholm 1
9400 Nørresundby
– Dänemark
Tlf. nr.: +45 96 32 81 11
Fax +45 98 17 54 99
E-mail: [email protected]
At installations pumping hot or very cold liquids, the operator must be aware that it is
dangerous to touch the pump surface, and, consequently, he must take the necessary
safety measures.
When connecting the pump and a prime mover the power transmission is to be equipped
with a guard in accordance with the provisions of the COUNCIL DIRECTIVE of June 14,
1989, on the safety of machines.
3.2 WIRING
Wiring to be carried out by authorized skilled workmen according to the rules and
regulations in force.
4. TRANSPORT/ STORAGE
The weights of the pumps (in A09 combination) are stated in the following table, and the pumps are
to be lifted as shown.
Pump
Weight kg
Pump
Weight kg
S32-25-110N
21.5
S80-70-275N
86.0
S50-32-135N
22.0
S100-80-175N
79.0
S70-50-175N
42.0
S100-80-220N
92.5
S70-50-220N
58.0
S100-80-275N
107.0
S70-50-275N
72.0
S125-80-220N
116.0
S80-70-175N
53.0
S125-80-275N
122.0
S80-70-220N
59.0
S125-100-220N
138.0
The pump is to be stored in a dry area.
Before shipment the pump is to be fastened securely on pallets or the
like.
The pump is to be lifted as
shown here:
The lifting straps must not bear against sharp edges and corners.
5. DISMANTLING
5.1 ACCESS TO IMPELLER AND SHAFT SEAL
Remove Allen screws (22), which hold the shaft seal cover to the pump casing, and pull the
bearing housing to remove the complete bearing housing with impeller, bearings, and shaft.