Refitting the driven half-pulley bearing
- Fit a new ball bearing with the specific tool.
- Fit the ball bearing retention snap ring.
- Fit the new roller bearing with the wording visible
from the outside.
CAUTION
PROPERLY SUPPORT THE HALF-PULLEY TO PREVENT
DAMAGE TO THE THREADED END WHILE THE BEARINGS
ARE BEING FITTED.
Specific tooling
020376Y
Adaptor handle
020456Y
Ø 24 mm adaptor
020362Y
12 mm guide
020171Y
Punch for Ø 17 mm roller case
Inspecting the clutch spring
- Check that the contrast spring of the driven pulley
does not show signs of deformation
- Measure the free length of the spring
Characteristic
Standard length
118 mm
Minimum length allowed after use
XXXX
Refitting the clutch
- Preassemble the driven pulley group with spring,
sheath and clutch.
- Position the spring with the sheath
- Insert the components in the tool and preload the
spring being careful not to damage the plastic
sheath and the end of the threaded bar.
Engine
ENG - 67
Summary of Contents for BOULEVARD 50 2T
Page 1: ...WORKSHOP MANUAL BOULEVARD 50 2T ...
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 16: ...INDEX OF TOPICS TOOLING TOOL ...
Page 24: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 36: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 42: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 58: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 60: ...INDEX OF TOPICS ENGINE ENG ...
Page 92: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 100: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 105: ...5 Sealing ring 6 Piston 7 Gasket 8 Spring Braking system BRAK SYS 105 ...
Page 106: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 110: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 114: ...INDEX OF TOPICS TIME TIME ...
Page 116: ...Crankcase CRANKCASE Code Action Duration 1 001133 Engine crankcase Replacement Time TIME 116 ...
Page 154: ......