background image

ASSEMBLY INSTRUCTIONS FOR THE

DF6800 VERTICAL KNEE RAISE

*NOTE IF YOU ARE MISSING HARDWARE OR HAVE ANY FIT UP PROBLEMS PLEASE CONTACT DELTECH FITNESS TOLL FREE (888) 258-0533

FOR YOUR SAFETY READ ALL INSTRUCTIONS CAREFULLY

(888) 258-0533

Summary of Contents for DF6800

Page 1: ...TIONS FOR THE DF6800 VERTICAL KNEE RAISE NOTE IF YOU ARE MISSING HARDWARE OR HAVE ANY FIT UP PROBLEMS PLEASE CONTACT DELTECH FITNESS TOLL FREE 888 258 0533 FOR YOUR SAFETY READ ALL INSTRUCTIONS CAREFU...

Page 2: ...OSSMEMBER QTY 1 ARM SUPPORT QTY 2 G RH UPRIGHT QTY 1 E LH UPRIGHT QTY 1 F NOTE IF YOU ARE MISSING HARDWARE OR HAVE ANY FIT UP PROBLEMS PLEASE CONTACT DELTECH FITNESS TOLL FREE 888 258 0533 J BACK PAD...

Page 3: ...NTING PLATE QTY 4 M12 WASHER QTY 32 S M12 LOCKNUT QTY 16 U M10 x 64MM BOLT QTY 4 M10 WASHER QTY 8 T NOTE IF YOU ARE MISSING HARDWARE OR HAVE ANY FIT UP PROBLEMS PLEASE CONTACT DELTECH FITNESS TOLL FRE...

Page 4: ...LE THE UPRIGHTS E F TO THE FEET H USING M12 x 70MM BOLTS P MOUNTING PLATES O M12 WASHERS S AND M12 NUTS U INSTALL RUBBER SHOES L TO THE ENDS OF THE FEET H FRAME ASSEMBLY P S H L O S U O H L N N L S P...

Page 5: ...TOM CROSSMEMBER D TO THE UPRIGHTS USING M12 x 70MM BOLTS P M12 WASHERS S AND M12 NUTS U BOLT THE OTHER END TO THE FEET USING M12 x 70MM BOLTS P MOUNTING PLATES O M12 WASHERS S AND M12 NUTS U FRAME ASS...

Page 6: ...INSTALL THE CHIN UP BAR I TO THE UPRIGHTS USING M12 x 70MM BOLTS P M12 WASHERS S AND M12 NUTS U CHIN UP BAR INSTALLATION P P S S S S U U I...

Page 7: ...ASSEMBLE THE UPPER CROSSMEMBER C AND THE ARM SUPPORTS G TO THE UPRIGHTS USING M12 x 70MM BOLTS P M12 WASHERS S AND M12 NUTS U ARM SUPPORT INSTALLATION U S U S S P C G G S P...

Page 8: ...INSTALL THE ARM PADS K TO THE ARM SUPPORT USING M10 x 64MM BOLTS Q AND M10 WASHERS T ARM PAD INSTALLATION K T T Q Q K...

Page 9: ...INSTALL THE BACK PAD J TO THE UPPER CROSSMEMBER USING M10 x 25MM BOLTS R AND M10 WASHERS T R T J BACK PAD INSTALLATION...

Page 10: ...REMOVE THE BACKING FROM THE SAFETY TREADS W AND INSTALL ON THE TOP OF THE LH RH BRACES TREAD INSTALLATION W W...

Page 11: ...ED SUPERVISION AND PROPER TRAINING NEVER WORK OUT ALONE ALWAYS HAVE A PARTNER 5 SECURELY TIGHTEN ALL BOLTS AND REGULARLY CHECK TO ENSURE ALL BOLTS HAVE NOT LOOSENED 6 WEAR GOOD RUBBER SOLE SHOES ONLY...

Page 12: ...DELTECH MANUFACTURING INC 3910 OAKLAWN DR LOUISVILLE KY 40219 ALL ORDERS SHIPPED UPS GROUND MAKE CHECK OR MONEY ORDER PAYABLE TO DELTECH MANUFACTURING KENTUCKY RESIDENTS ADD 6 SALES TAX ALLOW 3 WEEKS...

Reviews: