8
InfraSuite Power Management
A. Firmly insert the power cables into the outlets/ sockets (
1
) and insert the
cable ties into the wire mounts (
2
), Please refer to
Figure 5-2
.
1
1
2
2
Cable Tie
Wire Mount
Cable Tie
Wire Mount
(Figure 5-2)
B. Firmly insert the wire mounts into the power cables (
3
) and insert each
cable tie’s peak into the according slot (
4
). Please refer to
Figure 5-3
.
(Figure 5-3)
3
3
4
4
Slot
Slot
Cable
Tie’s Peak
Cable
Tie’s Peak