5.

 

Start up: 

 

5.1.

 

Leave  Bypass  in  “bypass”  mode,  open  main  valve  and  flush  for 
several  minutes  in  order  to  avoid  impurities  from  entering  the 

softener.  When  you  do  not  use  a  Bypass,  open  the  main  valve 
slowly as described in 

5.4

 

5.2.

 

Fill  salt  bin  with  salt  in  the 

provided space. 

Use only specific 

salt tablets that are suitable for 

softeners.

 

 

 
 
 
 

 
 

 

5.3.

  Add  water  in  the  salt  bin  until  the 

water  level  is  approx.  10cm  (4”) 
high.  (the  floater  on  the  brine 

valve must be afloat)

 

 

 
 

 
 

 
 

 

 

5.4.

 

Turn  the  bypass  slowly  to  “service”  mode.  Open  the  main  valve 

when you do not use a Bypass. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for ESCALDA

Page 1: ... ON N G GU UI ID DE E E ES SC CA AL LD DA A 1 Parts 1 BYPASS 7 WATER OUTLET 2 VALVE HOUSING 8 BLENDING REGULATOR 3 RESIN TANK 9 HARDNESS REGULATOR 4 CONTAINER FOR DEVICE AND SALT 10 TO BRINE VALVE 5 BRINE VALVE floater 11 CONNECTIONS 1 2 3 4 1 6 WATER INLET 12 TO DRAIN ...

Page 2: ... below 50 C Protect softener and drain 12 against frost Make sure you have the latest installation manual at hand Check with your Delta supplier 3 Installation 3 1 Close main valve and make sure pressure is released from piping This can be done by opening at least one tap 3 2 Cut open main water supply in order to install direct connections to the Delta Softener or to install the Delta Bypass reco...

Page 3: ...er In order to guarantee that the device will keep on functioning perfectly in the future this drain pipe should be spirally reinforced to avoid later blocking and or kinks Please protect the drain against frost and heat min temp 5 C max temp 50 C W w w i t h elbow outlet with straight outlet maximum height and distance of flexible drain hose CAUTION For the installation of the flexible drain hose...

Page 4: ... the supplied overflow tap First pierce a hole Ø21mm in the side wall of the salt bin The location of the hole is not important make sure however that it is approx 10cm down from the top edge of the salt bin Once the hole has been drilled mount the overflow tap and secure it with the supplied nut After drilling remove all bits of plastic that have fallen into the salt bin A separate instruction le...

Page 5: ...vided space with the top side up Make sure that the brine valve goes all the way down to the bottom of the salt bin Make sure not to squeeze the tube avoid kinks Disconnect if necessary and reconnect correctly Close the cover 3 4 The device can be installed in the container in three different ways at the back to the left or to the right The support at the bottom of the container must be placed acc...

Page 6: ...2009 P6 3 4 1Connections at the back The arrow on the support in the container must be pointing to the back Place the device in the container with the connections at the back as shown below 3 4 2Connections to the left As in 3 4 1 ...

Page 7: ...lta Delta uses ppm settings of CaCO3 10 ppm CaCO3 1 fh 1 dh 1 78 fh Adjust the hardness regulator to the measured value This requires a hex key number 5 4 2 Blending regulator part number 8 on the illustration on page 1 With the blending regulator you can determine the outgoing hardness Depending on the desired residual hardness set outgoing hardness with a hex key number 5 The setting is proporti...

Page 8: ...do not use a Bypass open the main valve slowly as described in 5 4 5 2 Fill salt bin with salt in the provided space Use only specific salt tablets that are suitable for softeners 5 3 Add water in the salt bin until the water level is approx 10cm 4 high the floater on the brine valve must be afloat 5 4 Turn the bypass slowly to service mode Open the main valve when you do not use a Bypass ...

Page 9: ...ill drop down a little you will be able to see and hear this R stands for refill refilling the container with water at the end of the regeneration stage To make sure the softener is in regeneration there should be a small water flow to the drain and the water level in the container should drop 5 6 2 Let regeneration perform until it stops automatically The estimated time is approx 12 minutes When ...

Page 10: ...he container First the valve house cover make sure the connections fit in the large opening and the drain in the small opening Then place the front lid For future salt refills only the front lid has to be removed Don t forget to connect the overflow to the drain ...

Page 11: ...e about hydraulic softeners and domestic plumbing Proper working of the softener will be determined by proper installation An annual control of your Delta softener will guarantee optimal functioning and a long operating life The DELTA WATER ENGINEERING team is proud of its achievement in having provided in what we believe to be the best softener available today Moreover we are proud to have you as...

Reviews: