![Delta Regis DRFF-520SS Setup & Operation Manual Download Page 5](http://html1.mh-extra.com/html/delta-regis/drff-520ss/drff-520ss_setup-and-operation-manual_2478483005.webp)
DRFF-520SS P
recision S
cr
ew F
eeder
Setup instructions (continued)
Take a screwdriver bit that
will be used to pick the
screws, center the x- and
y- axis
Bit guide should be +0.2 mm wider than
bit diameter
Tighten screws from step 42
Tighten screws from step 43
Turn the top gate screw
counter-clockwise until
lightly tightened and back off
two full turns clockwise
No more than 0.2 mm gap between gate
and screw plate
Turn the side gate screw
counter-clockwise until
lightly tightened and back off
two full turns clockwise
No more than 0.2 mm gap between gate
and rail
Plug AC power adapter into
the back of feeder...
...and plug AC power adapter
into proper outlet
Pour a few screws into the
hopper
Switch power ‘ON’
The feeder starts to vibrate and roller
assembly begins to turn. The feeder stops
automatically when a screw arrives at
the stopper
Test picking screws with a
magnetized bit to familiar-
ize yourself with the feeders‘
operation
If required, plug in the sup-
plied grounding cord...
...and connect the clip to any
metal grounding point
55
54
53
52
51
50
49
48
47
46
45
44
Delta
Regis
Tools,
Inc.
Phone:
(772)
465-4302
7370
Commercial
Circle
Fax:
(772)
465-4368
Fort
Pierce,
Florida
34951
Email:
USA
www.deltaregis.com
5
Operating instructions
After completing the setup adjustments, reconfirm that the rail assembly is installed correctly (step 22) and
that the top and side gates are properly closed before filling the hopper (steps 47-48).