MADE IN BELGIUM ©
DELTA
LIGHT last update : 17/01/2008
01
HOLE PATTERN
INSTALLATION INSTRUCTIONS - PART A
LIMIT ZB 154 ANO / LIMIT ZB 154 EVG DIM ANO
LIMIT ZB 254 ANO / LIMIT ZB 254 EVG DIM ANO
1195
13
2
60
522,50
45
522,50
60
522,50
1195
MAKE A RESERVATION IN THE
CEILING AND USE THE OPTION
LIMIT ZB 154 BOX
MAKE BOX WITH
SAME
INNER DIMENSIONS
MAKE BOX WITH
SAME
INNER DIMENSIONS
OR
OR
160
220-240V
142
1227
01
HOLE PATTERN
MAKE A RESERVATION IN THE
CEILING AND USE THE OPTION
LIMIT ZB 254 BOX
160
220-240V
185
1227
LIMIT ZB 154
LIMIT ZB 254
01. MAKE AN OPENING IN CEILING OR INSTALL
RECOMMENDED LIMIT BOX
02. UNSCREW COVER WITH BALLAST
03. MAKE THE ELECTRICAL CONNECTION
04. RESCREW COVER WITH BALLAST
05. INSERT DEVICE IN THE CEILING
06. SCREW PLEXI(S) + DEVICE IN BOX
07. INSERT / REPLACE LAMP(S)
08. PLACE PC('S)
09. SWITCH ON
ON
OFF
05
02
03
04
07
08
06
ACCESSORY SET
ACCESSO
RY S
ET
ACCESSO
R
Y SET
ACCESSO
R
Y SET
X1
FOR LIMIT ZB 154
X2
FOR LIMIT ZB 254
03
1 = L
2 = N
3 = D1 = VIA PULSESWITCH
4 = D2 = N
PULSE SWITCH (NO)
ORANGE
INTERN
EXTERN
1
3
4
2
L
L
N
N
WHITE
˜˜
6 D1
7 D2
WINDOW 424 DOWN-UP
EVG DIM
D1
D2
DIMMING BY SWITCH CONTROL
03
10
PUSH
220-240V
H07 V-U 1 - 2,5mm²
DIGITAL DIMMING CONTROL
DIGITAL
DIMMING
CHANNEL
2
N
N
3
D2
4
D1
1
L
L
220-240V
EXTERN
INTERN
FOR
LIMIT ZB 154 EVG DIM ANO
AND
LIMIT ZB 254 EVG DIM ANO
NO
T FIX !
GOO
D
WRONG
07
08
06
< = >
< = >
CHECK ALIGNMENT
PC AND U-PROFILE
OUTSIDE
50
50