Delta Heat Service (562) 263-3600 | 4
Vent Hood Knock-outs and Mounting Locations:
FIG 1A
1
2
FOR REAR EXHAUST
FOR TOP EXHAUST
UNIT MUST BE VENTED TO THE OUTSIDE OF THE
BUILDING.
!
!
NOTE: The hood is of sufficient weight that two installers are recommended to prevent injury or dam
-
age to the hood in handling.
Before starting the installation, you must identify if the installation will be a rear exhaust or top ex-
haust installation.
Begin the installation by removing the appropriate knock-out that will provide the top or rear exhaust
point. See FIG 1A for knock-out locations.
CAUTION:
When knock outs are removed the
edges will be sharp!!! Sharp edges
should be filed or covered with metal
tape.
!
!