
20/32
Assembly Manuals
Connector 6-way for 150/280 Terminals – harness plant assembly
REV 04 – May 01, 2012
ADI-15458155-2
delphi.com/connectors
Position
Position
Position
Position
Item
Item
Item
Item
Data
Data
Data
Data
3.1.3 Position of the SL closing
mechanism
see page 11
11
11
11
3.1.4 Control Secondary Lock on close
(Step5)
The locking position of the PLR (SL) is checked by the end
position of the SL closing mechanism
3.2 Leak test
Leak Test required
3.2.1 Test parameter
Test realization = Pressure
Nominal Pressure = 300m Bar
Limits Good = 200 mBar < P < 500 mBar
3.3 Presence and position check of
cable tie
Depend on conditions.
3.4 CPA presence check
Is required when option is assembled.
3.4.1 Position of CPA presence check
Position in prototype holder (new standard):
Symetry middle of connector from top.
Point 1 CPA open
Point 2 CPA presence
A= 13,9 mm
B=18,25 mm
C=4mm
Switch probe head Ø 2 m
4444
Test
Test
Test
Test parameter
parameter
parameter
parameter
4.1 Step 1
Check SL on open
4.2 Step 2
Execute push test
4.3 Step 3
Check connection
4.4 Step 4
Close SL
4.5 Step 5
Control if SL is closed
4.6 Step 6
Execute leak test
4.7 Step 7
Check lock of cable tie
4.8 Step 8 (optional)
Check color of SL to distinguish Black/ Violet SL
4.9 Step 9 (optional)
Check presence and position of CPA
4.10 Step 10 (optional)
Check Cover
A
B
C
REQUIREMENTS FOR TESTING CONNECTOR 6-WAY