![dellonda DG5 Quick Start Manual Download Page 8](http://html1.mh-extra.com/html/dellonda/dg5/dg5_quick-start-manual_2468509008.webp)
5.18.
DIAGRAM 9
Attach the 3 side panels to the heater using 18 x 3/16” screw.
Note:
DO NOT
fit the front panel at this stage.
5.19.
DIAGRAM 10
Fit knob to door and chain to the rear of the door. Use M4 x 6 screw. Fix the other end of chain onto the hole on the control box
assembly. Locate the hooks on the bottom edge of the door into the cut outs on the bottom plate and push the door into position.
5.20.
DIAGRAM 11
(REGULATOR ARRANGEMENT)
Check that the regulator is closed and the tap is in the off position i.e. horizontal. Remove the seal cap from the
cylinder automatic valve and connect regulator to the gas cylinder by pushing regulator down vertically and firmly onto the cylinder
valve. Confirm full and secure engagement of regulator to the cylinder valve.
NOTE:
Ensure you leak test this joint as directed in
Section 6 after assembly is complete and when you
first connect the gas bottle.
WARNING!
Ensure full engagement of hose to regulator
and control unit.
WARNING!
Check that the worm drive clips at both ends
of the gas hose are fully tightened.
WARNING!
Arrange the gas hose and regulator to ensure
the hose does not come into contact with any high
temperature surfaces as it may melt and cause a fire.
After the cylinder is placed inside the heater, tightly
secure the cylinder with the belt.
NOTE:
See section 6 for Leak Check procedure.
Original Language Version
D
G5, DG6 Issue:6 (3,4,5) 30/06/2021
E
nsure gas hose is fully
engaged to stem and the
worm drive is fully
t
ightened.
T
ap in Off position