
- 18 -
8
1. Insert “SPS BD wire” into SPS
BD, I/F BD, MCU BD and TBT
BD (See Red Mark)
2. Dress “SPS BD wire” under
Middle Frame and adhere 3
conductive tapes to fix it on
Main SHD (See Orange mark)
3. Adhere an acetate tape to fix
“SPS BD wire” on Main SHD
(See Green mark)
9
1. Adhere mylars to Main SHD
2. Adhere an acetate tape on
“Mylar SHD MCU” and Middle
Frame to fix “SPS BD wire”
(See Yellow mark”)