-
11
-
2
1. Insert “SPS BD
wire” into I/F BD
2. Assemble I/F BD
and SPS BD to
Main SHD
3. Insert “SPS BD to
LED Driver BD
wire” into LED
Driver BD
4. Assemble LED
Driver BD into Main
SHD
5. Lock 10 screws to
fix “I/F BD”, “SPS
BD” and “LED
Driver BD” on Main
SHD
6. Assemble Mylar on
Main SHD to cover
SPS BD
Screw-driver
Torsion of
screw: 8.5±1Kg
Kg
SPS BD wire
(WIRE 24P/24P)
FFC EDP
(FFC EDP 30P/30)
SPS BD to LED
Driver BD wire