NOTE:
Never use the same bolts to secure multiple grounding cables.
For rack spans from 22 to 23.375 inches
The switch ships without the ground lug attached. To be NEBS-compliant, attach the ground lug using these steps.
Figure 6. Switch without ground lug
1
Remove the ground lug from the shipping bag and crimp the ground wire to the lug.
The ground wire is not included.
NOTE:
The grounding cable must comply with your local electrical codes in size and color. Wires are typically green or
green with a yellow stripe.
2
Attach the ground lug to the mounting bracket using two M5 nuts, included.
Torque to 30 in-lb.
Figure 7. Switch with ground lug
NOTE:
For proper ventilation, position the chassis in an equipment rack or cabinet with a minimum of 5 inches (12.7 cm)
of clearance around exhaust vents. The acceptable ambient temperature ranges are listed in the Environmental
Parameters section.
3
Attach the rack rails to the rack using four screws on the front of the rack and eight screws on the back of the rack.
NEBS compliance
17