-
13
-
4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Glove
4) Cleaning cloth
5) ESD protection
Item
Picture
Operation
Tools
Notes
1
1.
Place Main SHD on the
worktable.
2.
Assemble SPS BD into Main
SHD
3.
Insert FFC eDP into I/F BD
4.
Insert SPS BD to I/F BD wire
into I/F BD.
5.
Assemble I/F BD into Main
SHD
6.
Lock 8 PCBA screws
7.
Assemble Safety Mylar on SPS
BD
Philips-head
screwdriver
Torsion of
PCB screw:
6~7kgf
Summary of Contents for S2721QB
Page 1: ... 1 Simplified Service Manual S2721QB S2721QSB Version 01 Date 2021 03 08 ...
Page 8: ... 8 3 Wiring connectivity diagram FFC 1 FFC 1 Wire 1 ...
Page 18: ... 18 5 Trouble shooting instructions ...
Page 19: ... 19 ...
Page 20: ... 20 ...
Page 21: ... 21 ...
Page 22: ... 22 ...
Page 23: ... 23 ...
Page 24: ... 24 ...