1-6
Rack Installation Guide
&'$$($ )$*
2.
Use four 10-32 x 1/2-inch screws and four tapered washers to install each outer
slide in the rack, as shown in Figure 1-5.
The screws are threaded through the washers, the rail, and into the top and
bottom holes of the brackets, leaving the middle bracket holes open.
3.
Fully tighten the screws and then back them out about two turns.
Leaving the slide assembly loose makes it easier to align the intermediate slides
and the inner-slide rails.
vertical rail
10-32 x 1/2-inch
screws (8)
outer slide
tapered washers (8)
stationary bracket
adjustable bracket
4939tbk1.book Page 6 Friday, October 8, 1999 1:22 PM
Summary of Contents for PowerVault 51F
Page 1: ... 4939tbk1 book Page 1 Friday October 8 1999 1 22 PM ...
Page 2: ...4939tbk1 book Page 2 Friday October 8 1999 1 22 PM ...
Page 3: ... 4939tbk1 book Page 1 Friday October 8 1999 1 22 PM ...
Page 14: ...xii 4939tbk1 book Page xii Friday October 8 1999 1 22 PM ...
Page 16: ...xiv 4939tbk1 book Page xiv Friday October 8 1999 1 22 PM ...
Page 26: ...1 10 Rack Installation Guide 4939tbk1 book Page 10 Friday October 8 1999 1 22 PM ...
Page 27: ... 4939tbk1 book Page 1 Friday October 8 1999 1 22 PM ...
Page 40: ...xiv 4939tbk1 book Page xiv Friday October 8 1999 1 22 PM ...
Page 50: ...2 10 Guide d installation en rack 4939tbk1 book Page 10 Friday October 8 1999 1 22 PM ...
Page 51: ... 4939tbk1 book Page 1 Friday October 8 1999 1 22 PM ...
Page 64: ...xiv 4939tbk1 book Page xiv Friday October 8 1999 1 22 PM ...
Page 75: ... 4939tbk1 book Page 1 Friday October 8 1999 1 22 PM ...
Page 88: ...xiv 4939tbk1 book Page xiv Friday October 8 1999 1 22 PM ...