
www
.d
e
ll.c
om |
su
ppo
rt.
d
e
ll.
co
m
Adding Ferrites to New SCSI Cables or Power Supply
Use your fingers and/or a flat blade screwdriver to pry open the ferrites surrounding the power and SCSI cables.
See Figure 1-7 for opening ferrite on power cable and Figure 1-8 for opening ferrites on SCSI cable.
Please make sure the ferrites are placed on your new SCSI cable or power supply.
Figure 1-7. Opening Ferrite on Power Cable
Figure 1-8. Opening Ferrites on SCSI Cable