-
11
-
4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Hex-head screwdriver
4) Glove
5) Cleaning cloth
6) ESD protection
Item
Picture
Operation
Tools
Notes
1
1. Insert the LVDS cable into I/F
Board.
2. Assemble SPS Board in MAIN
Shielding
3. Insert the SPS Board cable
into I/F Board and then
assemble I/F Board into Main
Shielding
4. Lock 6 PCB screws and 2 hex
screws
1. Philips-head
screwdriver
Torsion of
PCB screw:
8~9kgf
2. Hex-head
screwdriver
Torsion of
hex screw:
5±0.6Kgf
2
1.
Assemble Mylar
(
Paste Mylar on Main
Shielding like the picture
showed
)
Summary of Contents for P2219HB
Page 1: ... 1 Simplified Service Manual P2219HB Version 01 Date 2021 02 04 ...
Page 7: ... 7 3 Wiring connectivity diagram FFC 1 Wire 1 FFC 2 ...
Page 14: ... 14 5 Trouble shooting instructions ...
Page 15: ... 15 ...
Page 16: ... 16 ...
Page 17: ... 17 ...
Page 18: ... 18 ...
Page 19: ... 19 ...
Page 20: ... 20 ...
Page 21: ... 21 ...