3 Power Connections
After installing the appliance in a rack, connect it to power and make sure it is operational.
Connecting an Appliance to Power
1. Remove the power cables from the shipping box.
2. Plug the power cables into the appliance power supplies. Wrap the hook-and-loop strain relief around the
power cable, as shown in
.
3. Connect the appliance to a power source.
Figure 7: Secure the Power Cable with the Strain Relief
The appliance turns on as soon as the power supplies are connected to a live power source.
Each controller contains a backup power supply (BPS). The BPS batteries begin to charge when the
appliance is connected to power. A full charge takes up to eight hours to complete; the NAS appliance
is not fully redundant until the battery is fully charged. The BPS provides the clustered solution enough
time to write all cached data to disk if the controller experiences a loss of power.
4. Check the LED on the front panel to make sure the appliance is operational (see
).
15
Summary of Contents for EqualLogic FS7610
Page 4: ...iv Dell EqualLogic Installation and Setup Guide ...
Page 5: ......
Page 8: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 15: ......
Page 16: ......
Page 20: ...14 Dell EqualLogic FS7610 Installation and Setup Guide 2 Hardware Rack Mounting ...
Page 22: ...16 Dell EqualLogic FS7610 Installation and Setup Guide 3 Power Connections ...
Page 24: ......
Page 26: ......
Page 27: ......
Page 32: ......
Page 34: ...28 Dell EqualLogic FS7610 Installation and Setup Guide 5 NAS Cluster Configuration ...
Page 42: ...Glossary 36 ...