Four-post L-bracket rail installation
Use these installation instructions for racks with M5 threaded holes, 9.5 mm (.354 in) square holes, or 7.1 mm (.279) round
holes.
Complete the switch installation in the following order:
1. Attach the L-brackets to the front of the switch.
2. Attach the inner rails to the switch.
3. Attach the outer rails to the rear of the four-post rack.
4. Slide the switch into the rack.
5. Secure the L-brackets to the front of the four-post rack.
NOTE:
You need a user-supplied Phillips screwdriver to complete this installation.
NOTE:
For the EIA 9.5 mm (.354 in) square-hole rack, insert the cage nuts into the rack holes before you secure the L-
brackets to the rack. The cage nuts ship with the brackets and rails.
To install the switch:
1. Remove the rails, L-brackets, and screws from the shipping container.
2. Attach an L-bracket to each side of the switch front using four M4 screws.
Z9432F-ON switch installation
17