Dell EMC PowerSwitch S5148F-ON Setup Manual Download Page 1

Dell EMC PowerSwitch S5148F-ON

Set-up Guide

March 2021
Rev. A01

Summary of Contents for EMC PowerSwitch S5148F-ON

Page 1: ...Dell EMC PowerSwitch S5148F ON Set up Guide March 2021 Rev A01 ...

Page 2: ...tial damage to hardware or loss of data and tells you how to avoid the problem WARNING A WARNING indicates a potential for property damage personal injury or death 2017 2021 Dell Inc or its subsidiaries All rights reserved Dell EMC and other trademarks are trademarks of Dell Inc or its subsidiaries Other trademarks may be trademarks of their respective owners ...

Page 3: ...on 8 Unpack 8 Rack or cabinet installation 9 ReadyRails installation 9 1U Tool less mount installation 10 Two post flush mount installation 11 Two post center mount installation 12 Four post threaded installation 13 S5148F ON installation 14 1U front rack installation 14 Optics installation 16 Optics removal 16 Switch power up 16 After switch installation 17 Chapter 4 Specifications 18 Chassis phy...

Page 4: ... may be emitted from the aperture of the optical transceiver ports Avoid exposure to laser radiation and do not stare into open apertures Topics Related documents Information Symbols Related documents For more information about the S5148F ON switch see the following documents OS10 Enterprise Edition Release Notes OS10 Enterprise Edition User Guide Installation Guide for the S5148F ON Switch Open N...

Page 5: ...NOTE The ESD Warning icon requires that you take electrostatic precautions when handling the device About this guide 5 ...

Page 6: ...g to your local electrical codes Environmental switch location continuous temperature range is from 0 C to 45 C 32 F to 113 F Operating humidity is from 5 to 85 percent non condensing continuous In a dry clean well ventilated and temperature controlled room away from heat sources such as hot cooling vents or direct sunlight Away from sources of severe electromagnetic noise Positioned in a rack or ...

Page 7: ...te power cable An AC power cable is included with the switch When installing AC or DC switches follow the requirements of the National Electrical Code ANSI NFPA 70 where applicable The switch is powered up when the power cable is connected between the switch and the power source CAUTION Always disconnect the power cable before you service the power supply slots The switch has multiple power cords ...

Page 8: ...ion Four post threaded installation S5148F ON installation Optics installation Switch power up After switch installation Unpack NOTE Before unpacking the switch inspect the container and immediately report any evidence of damage When unpacking the S5148F ON switch make sure that the following items are included One S5148F ON switch One RJ 45 to DB 9 female cable Two sets of rail kits no tools requ...

Page 9: ...omponent power ratings do not exceed the circuit capabilities Overloaded power sources and extension cords present fire and shock hazards Elevated ambient temperature If you install the switch in a closed rack assembly the operating temperature of the rack environment may be greater than the room ambient temperature Use care not to exceed the 45 C maximum ambient temperature of the switch Reduced ...

Page 10: ...ed to the rail assembly 1 Face the ReadyRails flange ears facing outward Place one rail between the left and right vertical posts Align and seat the back flange rail pegs in the back vertical post flange The center extractions show how the pegs appear in both the square and nonthreaded round holes 10 S5148F ON switch Installation ...

Page 11: ...rail Two post flush mount installation NOTE For more installation instructions see the installation labels attached to the rail assembly 1 For this configuration remove the latch castings from the front side of each ReadyRails assembly item 1 To remove the two screws from each front flange ear on the switch side of the rail and remove each latch casting use a Torx screwdriver Retain the latch cast...

Page 12: ...t to the post flange with two user supplied screws item 3 4 Repeat this procedure for the second rail Two post center mount installation NOTE For more installation instructions see the installation labels attached to the rail assembly 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user supplied screws item 1 12 S5148F ON swi...

Page 13: ...cedure for the second rail Four post threaded installation NOTE For more installation instructions see the installation labels attached to the rail assembly 1 Remove the latch castings from each end of the ReadyRails assemblies To remove the two screws each latch casting use a Torx driver Retain the latch castings for future rack requirements S5148F ON switch Installation 13 ...

Page 14: ...e four post configurations 1U front rack installation Configure the rails that are attached to the switch 1 NOTE For more information see the installation instruction labels on the rail Attach the inner switch rails to the S5148F ON switch Line up the rail with the mounting heads and attach the rail to the chassis Slide the rail back until it locks into place The following shows the detail of the ...

Page 15: ...eadyRails Slide the switch in until it is flush with the front of rack About three inches before you fully insert your switch the rail locking feature engages to keep the switch from inadvertently sliding out and falling Figure 8 Front rack installation S5148F ON switch Installation 15 ...

Page 16: ...into the port to ensure that it is seated properly Do not jerk or tug repeatedly on the tab Switch power up Supply power to the S5148F ON switch after you mount it in a rack or cabinet Reinspect your switch before power up Verify the following The equipment is properly secured to the rack Dell EMC recommends properly grounding the switch The ambient temperature around the unit which may be higher ...

Page 17: ...nfigure your switch after you have securely installed and powered on the S5148F ON switch see your open network installation environment ONIE compatible operating system documentation at www onie org S5148F ON switch Installation 17 ...

Page 18: ...s 44 mm Width 17 1 inches 434 mm Depth 18 1 inches 460 mm PSU fan tray handle 1 57 inches 40 mm Chassis weight with factory installed components 19 lbs 2 PSUs 8 62 kg 2 PSUs Rack clearance required Front 5 inches 12 7 cm Back 5 inches 12 7 cm Table 2 Environmental parameters Parameter Specifications Operating temperature 0 C to 45 C 32 F to 113 F continuously 5 C to 45 C 23 F to 113 F short term S...

Page 19: ...0115 Table 3 AC power requirements Parameter Specifications Power supply 100 240 VAC 50 60 Hz Maximum current draw per system 4 7A 3 9A at 100 120V AC 2 35A 1 95A at 200 240V AC Maximum power consumption 470 Watts Typical power consumption 200 Watts Table 4 DC power requirements Parameter Specifications Minimum and maximum input voltage range 40 5 48V 60V DC Input current at full load with fan 40 ...

Page 20: ...e bottom of the web page and select your country from the drop down menu To obtain product specific information enter the 7 character service tag known as a luggage tag or 11 digit express service code of your switch and click Submit To view the chassis service tag or express service code pull out the tag or enter the show chassis command from the CLI To receive more technical support click Contac...

Reviews: