Table 14 C-Series (Gen1) upgrades
Model number
Disk upgrade (to the next
higher model)
Hardware upgrade (to
the next higher model)
2 Phoenix-12 Compute
Servers (minimum
configuration)
Not applicable
Not applicable
3 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
4 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
5 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
6 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
7 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes) and one private and
two public switches
8 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
9 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
10 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
11 Phoenix-12 Compute
Servers
12 integrated disks
One server chassis (four
nodes)
12 Phoenix-12 Compute
Servers (maximum
configuration)
12 integrated disks
One server chassis (four
nodes)
Certified hardware in support of ECS 3.2
The following table lists the latest hardware pre-qualified for a Certified installation.
Note
All Arista switch models listed also ship standard with the ECS Appliance.
Table 15 ECS Certified hardware
Server models
Switch models
l
Dell DSS7000
l
Dell R730xd
l
HP Proliant SL4540 Gen8
One 1 GbE private switch is required to handle
management traffic:
l
Arista 7010T- 48
l
Arista 7048T
Hardware Components and Configurations
Certified hardware in support of ECS 3.2
23
Summary of Contents for ECS D Series
Page 1: ...Dell EMC Elastic Cloud Storage ECS D and U Series Hardware Guide 302 003 477 09 ...
Page 8: ...TABLES 8 D and U Series Hardware Guide ...
Page 25: ...CHAPTER 2 Servers l ECS Appliance servers 26 l Rack and node host names 30 Servers 25 ...
Page 32: ...Servers 32 D and U Series Hardware Guide ...
Page 33: ...CHAPTER 3 Switches l ECS Appliance switches 34 Switches 33 ...
Page 44: ...Switches 44 D and U Series Hardware Guide ...
Page 70: ...Third Party Rack Requirements 70 D and U Series Hardware Guide ...
Page 88: ...Power Cabling 88 D and U Series Hardware Guide ...
Page 89: ...CHAPTER 7 SAS Cabling l U Series SAS cabling 90 l D Series SAS cabling 93 SAS Cabling 89 ...
Page 99: ...Figure 61 U Series and D Series network cabling Network Cabling Network cabling 99 ...