background image

2

DLS

IMPORTANT SAFETY INSTRUCTIONS

This manual contains important safety information, which must be followed during the installation and main-

tenance operations of the equipment.

It is compulsory for the operators to read this manual and to strictly follow the instructions contained herein,

as DELIOS s.r.l. shall not be accountable for injuries caused to people and/or damages to things or to the

equipment if the following instructions conditions are not followed.

Summary of Contents for DLS Series

Page 1: ...INST T N Ext t t Carefully read these instructions before first use Code Date 28 08 2019 Rev 2 3 DLS GB...

Page 2: ...and main tenance operations of the equipment It is compulsory for the operators to read this manual and to strictly follow the instructions contained herein as DELIOS s r l shall not be accountable f...

Page 3: ...1 phase meter PV 1 PV 2 BATTERY HOME LOADS GRID 3 DLS ene n e e en n e L e e n n FIG 01 BACKU rati...

Page 4: ...pha 4 DLS e en n e L e e n n FIG 02 BACK erati...

Page 5: ...RS48 C J45 R 8 MO B a c c 4 5 5 FIG 04 FIG 05 FIG 03 DLS BACK erati...

Page 6: ...1 phase meter PV 1 PV 2 BATTERY HOME LOADS GRID DLS ene n e e en n e L e e n n FIG 06 RCD P v Lo...

Page 7: ...pha DLS e en n e L e e n n FIG 07 Privi g oa Ho oa...

Page 8: ...RS48 C J45 4 5 I 08 P v e e Loa Ho e Loa RCD DLS I 09 I 10 8 R 8 MO B r a c c r r...

Page 9: ...L1 L2 L3 L1 L2 L3 3 phase meter PV 1 PV 2 BATTERY HOME LOADS GRID DLS e en n e L e e n n e e er FIG 11 BACK erati 9...

Page 10: ...pha DLS e en n e L e e n n FIG 1 BACK erati 0...

Page 11: ...RS48 C 4 J45 4 5 DLS FIG 1 FIG 1 FIG 1 BACK erati 1 0 R 8 MO B a c c 0...

Page 12: ...L1 L2 L3 L1 L2 L3 3 phase meter PV 1 PV 2 BATTERY HOME LOADS GRID DLS e en n e L e e n n e e er P v Lo RCD I 16 2...

Page 13: ...pha DLS e en n e L e e n n Privi g oa Home oa I 17 3...

Page 14: ...RS48 C 4 J45 4 5 DLS RCD P v e e Loa L Home oa I 18 I 19 I 4 0 R 8 MO B a c c 0...

Page 15: ...DLS L1 L2 L3 L1 L2 L3 3 phase meter PV 1 PV 2 BATTERY HOME LOADS GRID PV 3 PV 4 PV 5 PV 6 e e e e en n e L e e n n FIG 1 BACKU rati...

Page 16: ...RS48 4 J45 4 5 DLS 2 3 3 3 2 2 2 3 1 FIG FIG FIG BACKU rati 0 R 8 MO B a c c 0...

Page 17: ...DLS 1 3 1 FIG FIG 6 BACKU rati BACKU rati...

Page 18: ...PV BATTERY HOME LOADS GRID DLS L1 ene n e I TIE I E TE g g 18 FIG 7...

Page 19: ...DLS series 48V T In PV INVERTER PV pha P gri i i r r i g P 19 FIG 8...

Page 20: ...DLS series PE N L N L PE N N L L N L PE PV INVERTER PV INV PV L N RS48 C 4 5 J45 pha P FIG 9 FIG FIG 1 1 N 0 R 8 MO B r a c c r r...

Page 21: ...DLS phase 1 meter PV 1 PV 2 BATTERY HOME LOADS GRID PV 3 PV 4 e e e e en n e L e e n n FIG 32 P v Lo 1 RCD_1 RCD_ P v Lo 1...

Page 22: ...RS48 C J45 4 5 I 33 P v e e Loa 1 Ho e Loa RCD_1 DLS I 34 I 3 to to 2 2 R 8 MO B r a c c r r...

Page 23: ...DLS FIG 36 P v e e Loa 2 RCD_2 1 23...

Page 24: ...ri t nl ali i n in rs to LS installation an al o t s st installation an onn tion tails Refe to e 1 fo asi installation ia a I Refe e 2 f installation i in ia a I Refe e 3 for A line line an T n t i in...

Page 25: ...st arri t nl ali i n in rs to LS installation an al o t s st installation an onn tion tails 1 DL e er e eri i 1 se s r e s s e i s i Refe to e 2 fo asi installation ia a Refe e 2 f nstallation i in ia...

Page 26: ...tallation i in ia a UP N Refe e 3 f INV UP N Refe e 34 f T112 n t i in ia a efe to 112 f t e t eet fo o e t o et l Refe e 35 f S an o e t o et l Th installati n r r st arri t nl ali i sta Th rati ns s...

Page 27: ...and a se e e tr sho s or re n the e ent o short r t hese nstr t ons are ro ded or a ed en neers he anu acturer oe not accept re pon ibility or in urie to people an a a e to thin occurre ro ron or not...

Page 28: ...e s i er se ri e r i s i I 28 E ab N E N 3 op atio ab i n A atio ha b o o t co i atio h a p ci ic i i ti to p i i oa n n n n O OWED t co i atio n n n n n n o n o on n E E I P P Enabl N ab I a EM2 a b...

Page 29: ...A N A N 1 N N e r o e re e e roce re or N N N re ec e N 1 N N e ec ro e er e e e e er e o e or e c e N N N e er o D o or r er e e e 4 P operation r sa t reasons the A operation i W in thi y te con i u...

Page 30: ...DLS series 5 e er e eri i 1 se s r e s s e i s i E ab N S y...

Page 31: ...1 re e e roce re or N N re ec e N 1 N e ec ro e er e e e e er e o e or e c e N N e er o D o or r er e e e 3 op atio ab i n A atio ha b o o t co i atio h a p ci ic i i ti to p i i oa n n n n O OWED t c...

Page 32: ...DLS series 32...

Page 33: ...D r Corso Noblesville 10 35013 Cittadella Padova ITALY Tel 39 049 9403206 Email info delios srl it www delios srl it se i e e i s s it...

Reviews: