Quick Installation Guide
Installation
deliberant
Page 12
Step 4.
Attach the following part of the mounting bracket to the APC Mach 5 V3 unit with
4 screws as displayed below
:
Step 5
Attach the second part of the mounting bracket to the wall using screws (not included)
as displayed below:
Step 6
Connect the mounting bracket parts together as displayed below and tighten up:
It is recommended not to tighten the units to its mounting brackets until the alignment
process of the antenna is complete.
Step 7.
Connect power adapter into PoE injector together with UTP cables.
IMPORTANT: Deliberant APC Mach 5 V3 maximum input voltage is 24V.
It is recommended to use shielded STP Ethernet cable to reduce exposure of the
electromagnetic noise.
Step 8.
Power-up the unit. The green Power LED must be on (refer at the respective section
LEDs
). Depending on link quality, up to four yellow LEDs will switch on, indicating that
link between two units was established successfully.
Step 9.
Run the
Antenna Alignment
tool on Web management interface and move the
antenna in the horizontal and vertical planes until the maximum RSSI visible on the
Antenna Alignment graph is achieved.
Step 10.
After the maximal RSSI is reached, tighten the units in the optimum position.