background image

3

MCD 

Installation & Operations Manual

d. Where possible, route the power cord away from other electrical 

lines. Do not run the power cord parallel to any low voltage signal 
wires.

e. Secure the power cord as required to prevent damage.

 9. Operation

a. With the spa filled to the proper level, run the spa controller 

through several cycles.

b. Verify that the Ozone Generator turns on and off as required by 

the controller: Depending on your model, one or two LED lights 
should be visible through the cover and should illuminate when 
the ozone generator is turned on.

c.  Verify that gas is flowing into the injector (there should be no 

water in the tubing, and very small bubbles entering the spa 
through the return).

d. Verify that water does not push past the check valve during any 

spa cycle.

e. Check for and correct any leaks.

 10.  Installation  Complete

a. Once properly installed, the Ozone Generator requires no further 

user operation. It will operate automatically with the spa system.

SECTION 2 Maintenance Instructions

The MCD is equipped with a replaceable ozone cell and power 
supply. For optimum performance, we recommend the ozone 
cell and power supply be replaced every five years. It is also 
recommended that the o-ring, hose barb insert, and be replaced at 
the same time. New replacement parts can be ordered from your 
local dealer. 

Follow the steps below to replace the old ozone cell, power supply, 
o-ring, and hose barb insert. REFER TO FIGURE 2 ON PAGE 5.

  1.  Remove the MCD from your spa

a. Shut off power to the MCD or to the spa, and disconnect the 

MCD power cord from the spa control pack.

b. Disconnect the ozone tubing from the MCD ozone outlet hose 

barb.

Summary of Contents for MCD-250U

Page 1: ...MCD U Spa Ozone Generator For Models MCD 50U MCD 250U Installation Operations Manual 4 2308 01 Rev A...

Page 2: ...or under a cover sheltered from natural elements rain sun sprinklers Mount the MCD so that it is inaccessible to anyone in the spa Mount the MCD using the mounting tabs such that the MCD is vertical w...

Page 3: ...Assembly 1 5 Mounting 1 6 Plumbing Vacuum System 1 7 Plumbing Ozone Generator 2 8 Electrical 2 9 Operation 3 10 Installation Complete 3 SECTION 2 Maintenance Instructions 3 1 Remove the MCD from your...

Page 4: ...Installation Parts Common Installation Parts for MCD Spa Ozone Generators One 1 Installation Manual 4 2308 01 One 1 check valve 7 1140 01 Five 5 feet of tubing 7 0075 Four 4 hose clamps 2 0078 Two 2...

Page 5: ...ource Secure tubing in this position c Cut the tubing near the vacuum source slide hose clamps on each end and install the check valve in the tubing Observe the flow arrow on the check valve and ensur...

Page 6: ...does not push past the check valve during any spa cycle e Check for and correct any leaks 10 Installation Complete a Once properly installed the Ozone Generator requires no further user operation It...

Page 7: ...ozone cell up and out grommet and hose barb fitting may remain attached to ozone cell d Remove and discard ozone cell power supply and Hose Barb fitting along with tubing 4 Install the new ozone cell...

Page 8: ...5 MCD Installation Operations Manual Figure 2 MCD Component Locations OZONE POWER SUPPLY MOUNTING SCREWS OZONE CELLS HOUSE BARB FITTING SLIDE COVER OFF LIFT COVER UP...

Page 9: ...6 MCD Installation Operations Manual DELQUIK BASIC WATER CHEMISTRY CHART...

Page 10: ...and power supply replacement information For optimum performance we recommend the ozone cell and power supply be replaced every five years Fill out the following form each time you replace the ozone c...

Page 11: ...ability or implied warranty of fitness for particular purpose and such warranties are hereby disclaimed f DEL Ozone shall not be liable under any circumstances for loss of use of such product loss of...

Page 12: ...3580 Sueldo Street San Luis Obispo CA 93401 800 676 1335 o3info delozone com www delozone com EPA Estab No 071472 CA 001...

Reviews: