![Deka Fahrenheit 2V NB Installation And Operation Manual Download Page 6](http://html.mh-extra.com/html/deka/fahrenheit-2v-nb/fahrenheit-2v-nb_installation-and-operation-manual_2465436006.webp)
7. Base and module layout should be compared to system
layout diagram. All ½-13 x 1.75" hardware (2 per corner)
are to be installed on the inside of the module for module to
base connection. All hardware should be checked for proper
torque before proceeding. Star washers are to be installed
with teeth towards module to ensure proper grounding.
Consult “Hardware Torque Requirements”
(pg 5) for proper torque values.
SYSTEM INSTALLATIONS
CONT.
5. Remove hardware holding modules together (4 bolt assem-
blies) and holding modules to pallet (4 bolt assemblies).
Hardware removed from module to module will be reused
to attach modules to modules. Hardware holding modules to
pallet can be discarded.
6
Module to Pallet Disassemble
6. Install modules onto bases using supplied lifting straps.
Consult below diagram for proper sling attachment and lifting.
Consult included system layout diagram for module position.
CAUTION: Never lift more than one module at a time with
the supplied lifting slings.
Module to Module Separation
2600_Fahrenheit-2V-NB-mod_I&O.indd 6
2600_Fahrenheit-2V-NB-mod_I&O.indd 6
2/22/22 2:45 PM
2/22/22 2:45 PM