11
© 2017 Dehaco B.V. • Original user and maintenance instructions for the YO28 water management system • YO-28_2017-11_v1.2_EN
4. Commissioning
4. COMMISSIONING
4.1 Setting up and installing the machine
1) Determine the most appropriate place to set
up the YO28. On a flat surface, and as close as
possible to the shower location.
2) Check the 5 mμ candle filter is in the filter holder.
3) Check that the water tank is empty and clean in
connection with legionella prevention (see § 5.4).
4) Ensure all taps on the back of the machine are
closed.
5) Fill the water tank with clean tap water.
6) Insert mains plug.
7) The light in the ON/OFF switch should light up,
otherwise there is no power to the machine.
8) Turn on the machine by pressing the green button
in the middle. The heating element and the clean
water pump will be switched on. Water will be
being pumped into the machine. The warm-up
period for a full tank is approximately 30 minutes.
9) Connect the hoses in accordance with the symbols
in the respective quick couplings:
-
Green shower hose in
A
.
-
The yellow drainage hose in
B
.
-
Red suction hose in
C
.
10) Open the three taps by the quick couplings.
11) Once the water is heated, the YO28 is ready for
use.
A
B
C
Candle filters