
1.
Technical features
3
2.
Technical information
4-5
3.
Envirolay test results
6
3.1. Envirolay technical information
6
4.
Installation guide for Envirotiles
7
5.
Setting up
8
6.
Ventilation
9
7.
Eaves starter rail
10
8.
Envirolay installation
11-12
9.
Fitting battens
13-16
10.
Dry verge installation
17
11.
Installing the Envirotiles
18-22
12.
Abutment walls
23-24
13.
Installing the ridge
25-26
14.
Final stages
27
15.
Installing hip roofs
28-29
16.
Installing eaves starter rail
30
17.
Installing Envirolay
31
18.
Installing Envirotiles
32
19.
Single hip roof faces
33
20.
Double hipped roof faces
34
21.
Ventilated ridge and hip roll
35
22.
Installing the ridge
36
23.
Installing the hip ridge
37
24.
Fitting the gutters
38
25.
Envirotile slate components list
39
26.
Envirotile standard components list
40
27.
Envirotile standard/slate components list
41-42
CONTENTS
BE SAFE WHEN WORKING AT HEIGHT
Ensure you conform to the latest Work at
Height Regulations. For more details, visit:
www.hse.gov.uk/work-at-height
If in doubt at any stage
0800 988 7307
Please contact the customer services department
from which you purchased the Envirotile from.
INSTALLATION GUIDE
ENVIROTILE
ISSUE 1
2020
Summary of Contents for ENVIROTILE
Page 43: ...DESIGN GRID 4 3 ...