K110 Engineering ICP Programmer User Manual
www.dediprog.com 16
VI.
Applications
In the
engineering mode
, once the K110 has been tested and created a project file (*.dprj),
there are several methods to conduct production.
Method A. Through Dediware
Operate and monitor all the production processes through Dediware. All the procedures will
be recorded in the log and it can program serial numbers and the unique key’s related serial
numbers as well.
Step1
:
Test and save the project (*dprj) under Dediware engineering mode. Make sure to
select “Start from handler” for start mode in the Config window.
Step2
:
Load the project file under production mode, and then start programming.
Method B: Through CLI
CLI can integrate with the production software. Importing project files to start according to
your production demands. However, the log and the serial number programming are not
available under this circumstance.
Step 1:
Test and save the project (*dprj) under Dediware
engineering mode
. Make sure you
select “Start from handler” for
start mode
in the
Config
window.
Step 2:
Connect the CLI (Command line) with your production software and import project file
to proceed. Please use the CLI that is provided by DediProg.
Method C. Standalone Programming (Use start button)
ICP
USB
USB
ICP