MCA
Pro
45/65/90/115
MCA-Pro ISM Rv.4.1 2/2017
12
•
Maintenance is necessary; warn the Operator/
ultimate owner of the obligation to check the
appliance and maintain it in good working order.
•
Give all the instruction manuals to the Operator/
ultimate owner.
WARNING
Serious property damage and/or personal injury can
occur if the pipes are not protected from freezing,
resulting in the pipes bursting. The boiler may also
shut down. Turn off the water supply and drain the
water pipes or protect them from freezing when
leaving the home unattended for long periods of time
during very cold weather conditions.
The boiler is designed to provide a comfortable
and warm environment and is not designed for the
prevention of frozen water pipes. In case an unsafe
condition occurs, the boiler has been designed and
equipped with several safety devices that will shut
down the boiler and stop it from restarting.
If the boiler is dormant for an extended period of time
during cold winter weather, the water pipes may freeze
and burst which can result in extensive water damage
and lead to mold growth. A variety of molds can cause
serious health and respiratory problems. If water
damage should occur, immediately dry the affected
areas to avoid the possibility of mold growth.
If the building will be empty for an extended period of
time in cold winter conditions, then the following steps
should be taken:
•
Turn off the building’s water supply, drain the pipes
and add some antifreeze for potable water for the
toilet tanks and drain traps.
•
Open faucets where appropriate
•
Have the building monitored and checked during
cold winter weather and call a qualified service
technician if necessary.
•
Remote temperature sensors are available and can
be installed which will alert someone if freezing
conditions occur in the building.
1. Introduction
1.1 Abbreviations
•
HS: Heating system
•
DHW: Domestic hot water
•
PCB: Printed Circuit Board
•
SU: Safety PCB
•
PCU: Primary Control Unit - PCB for managing
burner operation
1.2 General
1.2.1. Operator/ultimate owner liability
To guarantee optimum and reliable operation of the
boiler, the Operator/ultimate owner must respect the
following instructions:
•
Read and follow the instructions given in the
manuals provided with the appliance.
•
Call a professional licensed heating contractor
to carry out installation, initial start up and
maintenance.
•
Get your installing contractor to explain your
installation to you.
•
Keep the instruction manuals in good condition
close to the appliance. (Preferably in a service
binder).
•
Care should be taken to ensure that children do not
play with or near the appliance.
1.2.2. Manufacturer’s liability
Our products are manufactured in compliance with
the requirements of the various North American codes
and standards. They are therefore delivered with CSA
certification and all relevant documentation.
In the interest of our customers, we are continuously
endeavouring to make improvements in product quality.
All the specifications stated in this document are
therefore subject to change without notice.
Our liability and warranty may not be invoked in the
following cases:
•
Failure to abide by the instructions on using the
appliance.
•
Poor, insufficient or a lack of maintenance of the
appliance.
•
Failure to abide by the instructions on installing the
appliance.
1.2.3. Installer’s liability
The installer is responsible for the installation and inital
start-up of the appliance. The installer must respect the
following instructions:
•
Read and follow the instructions given in the
manuals provided with the boiler.
•
Carry out installation in compliance with all national
and local codes having jurisdiction.
•
Perform the initial start-up and carry out all
mandatory checks.
•
Explain the installation and operation of the boiler
to the user.
•
SCU: Secondary Control Unit - Electronic printed
circuit board for extra connections
•
IF-01: 0 - 10V control PCB
•
SCU-S02: Extended control PCB
•
PWM: Pulse Width Modulation
•
OT: OpenTherm
Summary of Contents for MCA Pro 115
Page 45: ...45 MCA Pro 45 65 90 115 MCA Pro ISM Rv 4 1 2 2017 4 Installation H D G C B A E I J F ...
Page 117: ......
Page 118: ......
Page 119: ......