
1.
Always bolt van shelving mounting attachments to the lateral steel tubes which run underneath
the deck. Each deck half contains six or seven 1” x ½” galvanized steel tubes co-molded laterally
into the deck’s HDPE. The steel tubes are indicated by dimples in the surface of the deck as
shown in
BLUE FIG 1A
.
Do not bolt or screw shelving only to the HDPE material of the DECKED
system.
Do not drill into the C-channel, indicated by
RED FIG 1A
. This channel is where the drawer wheels
roll. If van shelving components need to be located on top of the steel C-channel, see
FIG 2E
for
reference.
d e c k e d
.
co m
| 1
FIG 1A
lateral steel tubes
(blue)
C-channel
(red)